Today was another productive day. More painting outside and inside. Even the flag pole got painted. More PC cabinets were made. A concrete ramp was completed. I think it took 40 wheel barrels to finish. Somebody figured out that 15,000 tie wraps were used for the rebar construction. Racking of leaves was a big project. The picture is of Matt Befus, Natalia the younest and Matt's mother Elenora. Our 2nd and last day off will be a trip to the ocean in Jaco. Lisa Befus should be arriving around 10pm tonight from Wheaton. Everything else seems to be doing fine. Wally<><
Tuesday, January 15, 2008
Work Day 3
Today was another productive day. More painting outside and inside. Even the flag pole got painted. More PC cabinets were made. A concrete ramp was completed. I think it took 40 wheel barrels to finish. Somebody figured out that 15,000 tie wraps were used for the rebar construction. Racking of leaves was a big project. The picture is of Matt Befus, Natalia the younest and Matt's mother Elenora. Our 2nd and last day off will be a trip to the ocean in Jaco. Lisa Befus should be arriving around 10pm tonight from Wheaton. Everything else seems to be doing fine. Wally<><
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment