Friday, January 18, 2008

Work Day 5







Work day 5 we made some concrete to finish off what wasn't finished yesterday. Concrete blocks were moved from a pile and placed around the foundation. The blocks will be placed two high all the way around. The floor for the building has the double rebar, a layer of concrete that covered the rebar. Then there will be a layer of gravel, which will have the electrical and plumbing. On top of the gravel will be another layer of concrete. There was more painting and PC cabinet building.
Tonight we will visit downtown San Jose and go out to dinner.
One more day of work and back home to cold Illinois. Today is warm 84 degrees.
Wally<><